Run the numbers
What one position is costing you.
Put in one spool or elbow you replace on a schedule. This is what that single position spends in a year, before anyone argues about what it is worth to measure it.
Your position
This position, every year
$105,000
3.0 changeouts a year at $35,000 all in, for as long as the line runs.
That is one position. Most sites have several.
Talk about this positionValidated in the field
12×
return on one survey engagement, the published figure
An operator of critical water infrastructure
~50 m of NPS 24 steel pipeline
Their engineers needed to know whether an existing line could be recommissioned or had to be replaced. HELIX mapped wall thickness, screened for cracking along the run and delivered a 3D asset model. The fitness-for-service call stayed with their engineers.
See the project →